A complete guide to the operation and maintenance of a decanter centrifuge: extending the life of the equipment

2025/03/12

In various industrial fields today, the horizontal screw centrifuge has become an indispensable key equipment with its extraordinary separation performance. However, if you want to ensure that it can operate continuously, stably and efficiently, and maximize its service life, a set of scientific, rigorous, comprehensive and meticulous operation and maintenance strategies is undoubtedly the top priority. 1. Careful preparation before operation 1. Careful inspection of the installation environment - The horizontal screw centrifuge has specific requirements for the installation site. It must be properly placed on a stable and solid foundation, so as to effectively avoid displacement or even damage due to strong vibration during the operation of the equipment. At the same time, the site environment should always be kept dry and well ventilated, which can not only prevent humid air from causing short circuits in electrical components, but also eliminate the hidden danger of overheating of the equipment due to poor heat dissipation with the help of smooth ventilation. - Carefully check whether there are various obstacles around the equipment, and make sure that the feed pipe, discharge pipe and maintenance channel are unobstructed, providing convenient conditions for daily routine operations and emergency maintenance work. 2. Accurate assessment of material properties - Before starting the centrifuge, it is important to fully and deeply understand the properties of the material to be processed, such as viscosity, solid content, particle size and distribution, corrosiveness and other key factors. It should be noted that different material properties will directly affect the initial setting of the equipment operating parameters. For example, when facing high-viscosity materials, it may be necessary to moderately reduce the feed rate to ensure that the separation effect can meet the standard while maintaining the load of the equipment within the normal range. - If you encounter corrosive materials, it is particularly important to confirm in advance whether the material of the part of the equipment that contacts the material is suitable. If necessary, protective measures should be taken decisively, such as timely replacement of corrosion-resistant linings or coatings to ensure the safe operation of the equipment. 3. Careful inspection of equipment components - Carefully check key components such as drums and screw conveyors, and pay attention to signs of deformation, cracks or wear. The integrity of these components is directly related to the separation accuracy and the stability of equipment operation. Once slight wear is found, record it immediately and evaluate the possible impact in the future; if serious damage is found, the machine must be stopped immediately for repair or direct replacement of parts. - Check the tightness and wear of the drive belt (if the equipment is equipped). Appropriate belt tightness can not only ensure the efficient transmission of power, but also minimize the risk of belt wear and breakage. In addition, check whether the bearings, seals and other components are in normal condition and whether there is any leakage, so as to ensure that the equipment has good sealing during initial operation. 2. Accurate monitoring during operation 1. Real-time tracking of operating parameters - Make full use of the advanced control system of the equipment and pay close attention to a series of key parameters such as speed, feed speed, differential speed, temperature, pressure, etc. The stability of the speed is the basis for ensuring the constant centrifugal force. If the speed fluctuation is too large, it is very likely to cause the separation effect to be greatly reduced; if the feed speed is too fast, it is easy to cause the material to stay in the drum for too short a time, thereby affecting the sedimentation effect of the solid phase. - Precise control of differential speed plays a decisive role in the discharge efficiency of the screw conveyor. It is necessary to make timely adjustments according to the real-time changes of the material, so as to ensure that the sediment can be discharged in time and smoothly, and never affect the clarity of the liquid phase. In addition, once the temperature is too high, it may indicate that the equipment is overloaded or there is a problem with the cooling system. At this time, it is necessary to check the cause in time, such as whether there is material blockage or cooling system failure. 2. Careful observation of the separation state of the material - Check the separation state of the material in the drum regularly through the sight glass or sampling port, focusing on key indicators such as the thickness of the solid phase layer and the clarity of the liquid phase. If the solid phase layer is too thick, it is very likely to increase the workload of the screw conveyor, and in severe cases it may even cause blockage. In this case, it is necessary to adjust the feeding or discharge parameters appropriately; and if the liquid phase is turbid, it is very likely that the separation efficiency has decreased. At this time, it is necessary to carefully check whether the equipment has hidden dangers of failure or whether the operating parameters are set reasonably. 3. Sensitive capture of abnormal vibration and noise - During the operation of the equipment, once abnormal vibration or noise is detected, it must not be taken lightly. This may be caused by many reasons such as unbalanced drum, loose parts, damaged bearings, or foreign matter mixed in the material. Once such a situation occurs, it is necessary to stop the machine immediately and conduct a comprehensive investigation. The root cause of the problem should be found out with the help of professional means such as dynamic balancing test and component tightening inspection. The equipment can be restarted only after the repair is complete, so as to avoid small problems from gradually worsening and eventually causing serious damage to the equipment. 3. Careful maintenance after operation 1. Delicate operation of cleaning and sewage discharge - After each operation of the equipment, it must be cleaned in time and thoroughly to thoroughly remove the residual materials in the drum, screw conveyor, feed pipe, and discharge pipe to prevent the materials from drying and corroding the equipment. When cleaning, you can use clean water to rinse. For sticky or oily materials, you can also use chemical cleaning agents to assist in cleaning. Make sure that the cleaning work is thorough. - Open the drain valve to drain all the sewage and waste liquid accumulated in the equipment to avoid long-term residual bacteria breeding and corrosion of the machine body. At the same time, carefully check whether the drainage system is unobstructed and whether there are hidden dangers of blockage. 2. Careful arrangement of component maintenance and replacement - For parts that are extremely easy to wear, such as drums and screw conveyors, detailed inspections should be carried out, the degree of wear should be accurately measured, and a replacement plan should be formulated in an orderly manner based on the wear data. Usually, when the degree of wear exceeds a certain limit, it will have a significant impact on the performance of the equipment, so it is necessary to reserve suitable spare parts in advance so that they can be replaced in time at critical moments. - Regularly replace key consumables such as bearings and seals. Even if these parts appear to be operating normally on the surface, their service life is limited after all. Regular replacement can effectively prevent leakage, equipment jamming and other faults. For the lubrication system, the lubricating oil should be supplemented or replaced in strict accordance with regulations to ensure that all moving parts can be well lubricated. 3. Strict implementation of electrical system maintenance - Carefully check whether the electrical circuit is damaged or aging, whether the joints are firm and reliable, and resolutely prevent electrical failures from causing unexpected equipment shutdowns or even fire accidents. The electrical components in the control cabinet, such as relays, contactors, and frequency converters, should be carefully cleaned to remove dust and oil on the surface to ensure that they can work normally. - Regularly calibrate the sensors of the equipment to ensure the accuracy of operating parameter monitoring and provide a solid and reliable basis for precise control. At the same time, if necessary, the control system of the equipment should be upgraded with software to further improve the intelligence level of the equipment by optimizing the control algorithm. IV. System planning for long-term maintenance 1. Establish fine management of maintenance files - Tailor a detailed maintenance file for each horizontal screw centrifuge, and record the purchase date of the equipment, installation and commissioning details, start and end time of each operation, various parameters during operation, specific content and implementation time of maintenance, detailed list of replacement parts, etc. Through in-depth analysis of archival materials, key information such as the failure pattern of the equipment and the wear cycle of components can be accurately summarized, providing a strong basis for the subsequent formulation of a scientific and reasonable maintenance plan. 2. Strict implementation of regular professional inspections - At regular intervals, such as half a year or a year, actively invite professional inspection agencies or technical personnel from equipment manufacturers to conduct comprehensive and in-depth inspections of the equipment, covering many items such as mechanical performance testing, dynamic balancing verification, and electrical safety inspections. Professional inspections can keenly discover potential problems that are difficult to detect during daily maintenance and repair them in a timely manner, thereby ensuring that the equipment is always in a healthy and good state during the long use process. 3. Solid advancement of personnel training and technical reserves - Regularly organize operators and maintenance personnel to participate in professional training to familiarize them with the latest technology, operating points and maintenance techniques of the equipment. The skilled operating skills of operators can effectively reduce the occurrence of misoperation, and the superb technology of maintenance personnel can quickly diagnose and repair equipment failures. The close combination of the two can greatly extend the service life of the equipment. - The company should also build a complete technical reserve mechanism, widely collect and organize various technical information and maintenance cases related to horizontal screw centrifuges, and actively encourage employees to share their experiences so that when encountering difficult problems, they can quickly find solutions from internal resources and comprehensively improve the overall maintenance level of the company. In summary, through rigorous and meticulous pre-operation preparation, accurate and error-free monitoring measures during operation, careful and thoughtful post-operation maintenance actions, and systematic and comprehensive long-term planning and layout, we can comprehensively and thoroughly guarantee the normal operation of the horizontal screw centrifuge, effectively extend its service life, and lay a solid equipment foundation for the company's stable production and operation.

CONTACT US
Just tell us your requirements, we can do more than you can imagine.
Send your inquiry

Send your inquiry

Choose a different language
English
Español
Português
русский
Current language:English