Construction pile driving mud refers to a mixture rich in clay, sand, water and possibly containing additives (such as bentonite, polymers, etc.) produced in construction foundation engineering, especially when bored piles, impact bored piles, rotary bored piles and other construction methods are used. This type of mud plays the following key roles in the pile driving process: 1. Wall protection: The mud forms a liquid column during the drilling process, which generates hydrostatic pressure on the hole wall to prevent the hole wall from collapsing and maintain the hole diameter stable. 2. Carrying cuttings: The rock cuttings generated by the drill bit breaking the stratum are brought to the ground through the circulation of the mud, avoiding the accumulation of rock cuttings in the hole and affecting drilling. 3. Cooling and lubrication: The mud can effectively cool the drill bit, reduce the wear of the drill tool, and play a lubricating role to reduce the drilling resistance. 4. Anti-drilling: The fluidity of the mud helps prevent the drill from being stuck due to the accumulation of rock cuttings between the drill tool and the hole wall. However, after the pile driving is completed, a large amount of waste mud becomes waste that needs to be properly handled. This type of mud has the following characteristics: - High water content: The mud is mainly composed of water and suspended solids, and the water content is usually as high as 90% or more. - High viscosity: In order to ensure the wall protection effect, the mud usually contains a certain proportion of clay and other thickeners, which makes the mud have a higher viscosity. - May contain harmful substances: Depending on the geological conditions and the use of additives, the mud may contain harmful substances such as heavy metals, oils, and chemical additives. The treatment of construction pile mud mainly includes the following aspects: 1. Solid-liquid separation - Gravity separation: Through equipment such as vibrating screens and sedimentation tanks, the density difference between the solid phase and the liquid phase in the mud is used for preliminary separation. - Centrifugal separation: Using equipment such as centrifuges and cyclones, centrifugal force is used to accelerate solid-liquid separation and separate finer particles. - Filter pressing and dehydration: Through equipment such as plate and frame filter presses and belt filter presses, mechanical pressure is applied to the mud to separate the water through the filter cloth to form a mud cake with a lower water content. 2. Solid waste treatment - Dehydrated mud cake: can be further dried, dried or treated with curing agent to facilitate transportation and final disposal, such as landfill, resource utilization (such as brick making, roadbed materials, etc.). - Recovery of useful minerals such as fine sand: For mud containing valuable minerals, it can be recovered by classification, magnetic separation, flotation and other means. 3. Liquid part treatment - Clarification treatment: Remove suspended matter through sedimentation, flocculation and other methods to obtain relatively clear water. - Water quality standard treatment: If the liquid part contains excessive pollutants, it needs to be further chemically precipitated, adsorbed, biochemically treated, etc. to ensure that it can be discharged or reused after meeting the discharge standards. 4. Resource utilization** - Mud reuse: For mud with good performance, it can be recycled and reused for new piling operations after proper treatment. - Water resource recovery: The treated clean water can be reused for construction site flushing, green irrigation, etc., reducing the consumption of fresh water sources. The goal of construction pile driving mud treatment is to achieve reduction, harmlessness and resource utilization, which can not only reduce the impact on the environment, but also save resources and reduce costs. Choosing appropriate treatment technology and equipment, as well as strictly complying with environmental protection laws and regulations, are important considerations for construction companies in mud treatment.
Copyright © 2025 Shenzhou Group Co.,Ltd/Liaoyang Shenzhou Machinery Equipment Co.,Ltd - www.lnszjx.com All Rights Reserved.辽ICP备18010813号-1